Civic work underway and completed
What was done, where, when, and what changed — for every project in this demonstration record.
6 of 6 projects
Piloting solar-powered streetlights along a poorly-lit stretch identified through citizen issue reports, ahead of a wider ward rollout.
Park Road, opposite Community Hall · Oct 2026
Setting up a small community reading corner and children's activity space inside the community hall, in partnership with local volunteers.
Community Hall, Sector 3 · Sept 2026
Upgrading the storm-water drainage network to reduce monsoon flooding in low-lying areas.
Low-lying sectors 2 & 3 · Sept 2026
- 2.5 km Drain length
Upgraded the primary health outreach centre with a new waiting area, basic diagnostic equipment, and better ventilation ahead of the seasonal health camp.
Ward Primary Health Centre, Sector 3 · Jul 2026
- 1,200 Residents reached
Complete resurfacing of a 1.2 km stretch of Ward Road No. 4, including new drainage channels along both sides.
Ward Road No. 4 · Jun 2026
- 1.2 km Road length
- 450 Households benefited
Restoration of the central community park with new seating, walking track, and 200 new saplings planted.
Central Community Park · May 2026
- 200 Trees planted
- 800 m Walking track